0907440 - Further work on the Guildhall

Here follows an update on the progress of the Guildhall modelling. Based on the additional plans that have been provided, there is also a loft that needs to be included in the model. This is in the early stage of being added. The current focus of this aspect of the project is putting all the inside walls into place and properly aligning the doorways. Further study of the plans has shown that some additional doors will need to be added to the model. The existing doorways are also being extended in height. Spaces for the windows still need to be put into the walls. This will require careful matching up between the floor plan and the exterior plan.

The three main layers going into place.